Margaret Greene Splash Pad

Share on Facebook Share on Twitter Share on Linkedin Email this link

We’re building a new splash pad at Margaret Greene park in 2024! The new splash pad will be built next to the playground and will be fully accessible to all users.

Earlier in 2023, we presented two designs for community feedback. Of the two, the Natural Design was most popular as a base for the final splash pad. Learn about what else we heard from the community and how we will use that feedback to finalize the design in our Engagement Summary Report.

The Natural Design

And the Modern Design

Birds eye view 3D rendering looking northwest of an oval splash pad. there is a curved concrete wall, acrylic shade structure with coloured panels. concrete wall with backed benches, picnic tables and landform berms. Pathways connect to existing playground, washroom building and trails.

Check out "About the design concepts" below for more information about both options.



Your feedback helps us to:

  • Choose between two splash pad designs
  • Select shade structures and seating
  • Share any accessibility ideas or concerns

Thank you to everyone who participated in this survey. The consultation is now closed. we have used your feedback to finalize the Splash pad. Watch for construction to begin soon.

For more information

Christina Vannelli, Park Planner
Parks, Public Services
Phone: 519-822-1260 ex. 2431
Email: christina.vannelli@guelph.ca

We’re building a new splash pad at Margaret Greene park in 2024! The new splash pad will be built next to the playground and will be fully accessible to all users.

Earlier in 2023, we presented two designs for community feedback. Of the two, the Natural Design was most popular as a base for the final splash pad. Learn about what else we heard from the community and how we will use that feedback to finalize the design in our Engagement Summary Report.

The Natural Design

And the Modern Design

Birds eye view 3D rendering looking northwest of an oval splash pad. there is a curved concrete wall, acrylic shade structure with coloured panels. concrete wall with backed benches, picnic tables and landform berms. Pathways connect to existing playground, washroom building and trails.

Check out "About the design concepts" below for more information about both options.



Your feedback helps us to:

  • Choose between two splash pad designs
  • Select shade structures and seating
  • Share any accessibility ideas or concerns

Thank you to everyone who participated in this survey. The consultation is now closed. we have used your feedback to finalize the Splash pad. Watch for construction to begin soon.

For more information

Christina Vannelli, Park Planner
Parks, Public Services
Phone: 519-822-1260 ex. 2431
Email: christina.vannelli@guelph.ca

  • CLOSED: This survey has concluded.

    Our consultants have developed with two different concepts for the new splash pad coming to Margaret Greene Park.  The concepts are not finished designs, but instead they show a few different elements that can be included in the finished design for your feedback.  You will notice that specific spray equipment is not included in the designs presented.  That’s intentional.  We want to know what you would like to see in your park!

    Please take just five or ten minutes to share your thoughts on different design elements and what changes you would like to see considered for the final design.  Our team will use that feedback to complete a design and prepare for construction.

    Take Survey